Stage Coach Lane

Fallbrook, CA

2024

Through a several stage remodel we replaced carpet flors and stairs with USA grown and milled engineered Hickory floors, remodeled a guest bathroom, found and resolved the root cause of first floor retaining wall leaks and water damage, and built and installed a hardwood Ipe deck.